How much do you know about house construction?
Do you have any construction requirements?
Book Free ConsultationBackground investigation
Performance
Conflict resolution abilities
Inadequate methods and techniques
There is no set or reasonable pricing
Techniques and solutions based on primitives
The inability to have end-to-end ownership
Uncertain labor
Payment history
Updates on milestones are disorganized
Get in touch with our expert and share your requirements with us.
Talk to our expertWhy Prefab Homes?
Cost-effective
Time-saving
Environment-friendly
Durable
Advantages
Fabrication
Finishing
Less construction time
Fewer delays
Energy Effiecient
Zero waste production
Disadvantages
Limited design options
Finance problems
Management of utilities
High initial investment
Transportation cost
Problematic size
Damages during transportation
Problems with joinery
Common myths:
1. Preparatory stage
Get a project manager
Plan development
Designing phase
Obtaining permits and contractors
Selecting the right contractors
2. Acquisition stage
There are five different strategies when it comes to the acquisition of people and products:
The first method is to hire a contractor or a group of contractors to bring the plan designed by the architects to execution.
The planning and construction of the house can be carried out by the contractors, provided the client bears the liability.
A hybrid of the two methods is also used. In this method, the client with the management team works together to complete the project. The work is carried out by the management team and the contractors together. The client does not involve himself with the day-to-day activities.
A private finance initiative can also be undertaken. This is very useful for clients working on a limited budget. Private initiatives are mainly utilized by developing and underdeveloped nations.
3. Building stage
Demolition of any existing structures, or large stones that can cause a hindrance in the building process.
Landscaping activities are undertaken to remove unwanted plant growth and create sufficient space for building.
Other processes involved include refurbishment, zoning, or building a foundation.
4. Post work stage
A rigorous inspection of the structure is performed. Compromises cannot be made during the inspection to ensure the safety and security of the tenants living in the building. It is an ideal opportunity for the management to inform the customers on the operations and the keep up of the building. This stage is of vital importance in increasing the lifespan of the house.
Since all the stages of construction are completed, the client can officially take over the structure. The timeframe of warranties begins at this moment. Warranties are in place for the happiness and satisfaction of the customers.
The three types of warranties are:
Express warranty
Inferred warranty
Statutory warranty
Building a house? Find out how much it will cost to build a house.
Calculate House Construction CostIdentification of the contractor
Background investigation
Project approvals
Making home more sustainable
Choosing the right design
Cost overrun
Choosing the right materials
Time delays
Quality issues
Ineffective communication
Inspection problems
Going over budget
What you know about house construction and what you don't!
The do's about house construction.
Make time to oversee the job that has been completed and is still to be completed. Visit the construction site frequently to keep an eye on the project's progress. As previously said, building a structure is a time-consuming and frustrating task.
To oversee the construction project, give over the job to a reputable builder or contractor. It is critical to get dependable additional contractors to construct the structures.
The don'ts about house construction
Never underestimate the time and effort that goes into building a home. It's complicated, and getting it right takes time, money, and effort.
Don't keep to the budget; building costs and timelines may be higher than expected. During the construction process, unexpected challenges and complexities may develop.
Cement types used in home construction:
Ordinary Portland cement (OPC) 43 grade
53 Grade cement, Ordinary Portland cement (OPC)
Portland Pozzolana cement (PPC)
White cement
Rapid hardening cement
Hydrophobic Portland cement
Low Heat Portland cement
Which cement grade is ideal for building a house?
OPC cement
The OPC's grade 33
The OPC's grade 43
The OPC's grade 53
PPC cement
Masonry: Cement Blocks vs. Bricks
Dimensions
Cement blocks (both solid and hollow) come in 200mm x 400mm x 200mm for a 200mm thick wall and 100mm x 400mm x 200mm for a 100mm partition wall.
Bricks are typically 230mm x 110mm x 75mm in dimension.
Strength
Wear and tear are inevitable.
Mortar joints
Cost
Each solid concrete block costs between Rs. 20 and Rs. 40.
Each hollow concrete block costs between Rs. 50 and Rs. 90.
Bricks range in price from Rs. 4 to Rs. 20 per piece, depending on the quality sought. Exposed brickwork necessitates fine-cut edges and high-quality bricks, which are more expensive.
Bricks are typically 230mm x 110mm x 75mm in dimension.
Benefits of bricks
In comparison to hollow bricks, red bricks are noted for their endurance and the strength of the constructions they create.
Earthen materials are compacted into bricks. They are so thick due to their extreme compression that there is very little room for combustion to begin and spread.
Benefits of concrete blocks
AAC blocks are lighter than red bricks, providing increased workability, adaptability, and longevity.
Tremors, thunderstorms, and tornadoes, all of which are growing more prevalent these days, are more resistant to concrete blocks.
Ideal scheduling is a myth
Future planning is necessary
Proper finishing
Storage
Proper research of the contractors
More investment in fixtures
Neutral colors in the painting
Contingency fund
Building a house? Find out how much it will cost to build a house.
Building Material Calculator1. What are the steps to construct a house in Bengaluru?
2. How much does one have to spend on a house construction project?
3. What are the space requirements for house construction?
4. What is grading, site preparation and foundation construction?
5. What are the rough works, and what types of rough are done in construction?
6. Why is the installation of doors and windows important?