Step By Step House Construction - A Breakdown Of All Building Stages

Jun 03 2021

Anwesha Nandy

Constructing your new house can be both exciting and dreary. You need to comprehend the process and conquer the challenges and troubles while building your fantasy home. You need to be well aware of the fact that the house construction process varies from one area to another and from builder to builder. You ought to be cautious if you legally own the land in a residential zone; you must have in your possession each required document. 


Construction projects are certainly not completed in a single or simple step but comprise a progression of events or activities that should be finished over the long run. One way we can conceptualize an enormous-looking project to life is by breaking it down into smaller events and activities. 


There is a lot of work to be done before the commencement of the construction. Like planning, designing, appointing the contractors, estimating the number of materials, etc.


Here is a step-by-step house construction timeline, starting from pre-construction to post-construction:


  • Pre-construction stage
  • Procurement stage
  • Construction stage
  • Post-construction stage


End-to-end House Construction Process And Planning



A standard construction project, as a rule, has the following five significant house construction steps: Commencement, planning, execution, performance and supervision, and closure


Commencement phase of the construction project 


First of all, we need to create and evaluate the plan so we can decide whether it is attainable or not, and if not what should our attempts be to make it work. Here the project objective or need is distinguished. 

.

A reasonable outcome to the need is achieved with suggested arrangements and alternatives. You should be looking into every alternative unbiasedly. 


The planning phase of the construction project 


The planning stage includes further improvement of the project in detail to meet the owner’s requirements. The undertaker's errands and assets are distinguished, alongside the methodology for carrying out the project. 


A project plan is laid out which includes tasks, undertakings, circumstances, and time spans needed for each and every task. This is where CPM and PERT come into play.


The execution phase of the construction project 


This is the execution stage, where the plan is kicked off and crafted by the workers and site engineers. It is fundamental to keep up control and supervise the quality of work during every execution stage. 


Progress ought to be persistently observed and suitable changes which differ from the first arrangement should be made and recorded. A supervisor is a person who is responsible for quality and quantity progress. 


Execution and monitoring phase of the construction project 


This stage is completely identified with the estimation of progress and inspection of whether the work is progressing according to the estimated quality and quantity. This stage routinely occurs simultaneously with the execution stage. 


Conclusion phase of the construction project 


During the last conclusion, the significance is on giving the last expectations to the client, that is:

 

  • Giving over project documentation to the business 
  • End of provider contracts 
  • Delivering project assets 
  • Provide the conclusion of the project to all partners


Last is to lead drills and understand the analysis of the project to inspect what worked out positively and what didn't. This kind of investigation would increase the experience of the project associates, which will help in future projects.


Pre-construction stage



During the pre-construction stage, a work-out plan is made, a budget plan and course of events are settled upon, a plan for when the task will be started and finished, a permit is obtained, and the acquisition of both workers and resources takes place. 


The pre-development stage pertains to a series of assignments and occasions that either happens or should happen to precede the beginning of construction. Although this phase isn't often considered as a part of a construction project but is really an essential segment of all modern cutting-edge construction projects. 


Here's a fundamental breakdown of pre-construction stage exercises:


Secure a project planner 


Actually, the beginning of a development project happens when a project proprietor has thought about a project and starts to work with a project manager. During an initial presentation, the project supervisory group will set aside some tasks to evaluate whether a potential project is sensible and attainable. Assuming the project manager decides the project is practical, the task can really start. 


Plan development 


When a project supervisor and proprietor have consented to seek the project together, the main thing the project supervisory crew will do is make an essential advancement plan for the undertaking. This will incorporate the budget plan for the project and the assessed timetable for culmination. While this data is significant, the plan for the project will likewise serve as a guide for other construction workers during the rest of the task. From various perspectives, the plan created at the beginning of a project serves as a progressing reference point for every individual of the team to allude back to if necessary. 


Design 


Penning thought down is a tremendous advance towards changing a fantasy project into a reality. The next stage in the pre-development stage is to start the way toward creating a project design. To do as such, the proprietor and project manager should welcome extra partners. These will incorporate a design group that typically comprises at least one architect and an engineer. 


Making a design for a new project is a naturally collective process. While the common assumption is that both the architects and engineers work in storehouses, this is a long way from normal. Normally, both the architects and engineers will cooperate with the proprietor to make a plan that he is content with, that holds fast to wellbeing and administrative necessities, and meets any sustainability or design prerequisites the architects and proprietor have settled upon.


Permits and entitlements 


When a plan has been written down it is typically an ideal opportunity to seek after permitting. Sometimes getting permitted and entitlements can run simultaneously with the planning cycle. Ordinarily, the project manager aids in getting permits. Getting fundamental permits for activities of any size can be a baffling encounter. There will most likely be various authorities for giving permits that might or might not be having covered areas of obligation. This results in a frequent blend of local, state, and government guidelines that need to be explored. 


What is significant about both permits and entitlements is that it can require some investment. Delays in getting permits can also impact the construction timeline. Working with an experienced project manager will privilege you and possibly decrease this danger. 


Contractor selection 


During the pre-construction stage, contractors and subcontractors should be brought onto the project. Contractors are liable for dealing with the actual construction process. This incorporates utilizing their own workers and getting the services of any vital subcontractors needed to finish development. 


It is frequently said that the construction period of a project conveys the most danger. This is valid for various reasons and accentuates the significance of working with a potent, experienced contractor. Choosing the contractor, just like choosing different individuals for your development project group, ought to be done with vigilance and a sufficient degree of diligence.  


Procurement Stage



In house construction stages, the procurement stage is the one where we acquire laborers and products expected to bring the construction project to culmination in an opportune and fulfilling way. Typically, the procurement stage is spread out in a few steps: 


The Procurement Phase is where the result of engineering efforts is utilized to get offers for equipment, materials, and construction services. Procurement should be approached carefully in a strategic manner by a construction company to augment its effectiveness on every task. 


A construction firm should adopt a strategy to acquire procurement by buying the supplies needed in the most economic way. The procurement stage needs to contemplate different variables, like the timeline of events, budget plan, and nature of the project.


The Principal Procurement Methods


Generally, five procurement methods are being practiced in the industry. Every one of them will be examined in detail here:


Traditional method


In this procurement method, the design is built by the architects and engineers with the partnership of the owner. After the design is finalized, a contractor is hired to carry further with the project. This method is also known as design-bid-build.


Plan and build


As the name recommends, plan and build duty is covered by the contractor. Here, the client is liable for the account and activity. 


Construction management


This strategy for obtaining the framework is totally unique in relation to the conventional technique, plan, and build technique. Work is carried out by the management team and the contractor. The client is not directly in contact with the customer. Account and activity did by the customer. This technique will be picked if there are potential outcomes to recognize projects in bundles. 


Management contract


In this method of procurement, a management team is established, which works on fixed pay and is responsible for hiring and managing the contractors.


Private finance initiative


Project managers are exclusively liable for all elements of development. After fruitful finishing, the project will be moved to a proprietor. This is extremely useful for customers who don't have a sound monetary foundation. This strategy is largely utilized by legislatures of non-industrial nations.


A contractor is hired who looks after all aspects of the project ranging from planning to execution.


Construction stage



The construction phase is typically the phase of physical activities like site clearing, excavation, building, etc. It also includes demolition, landscaping, refurbishing, and associated activities.


This is the phase where contractors actually come into play. He is responsible for the construction work and also in large projects a supervisor is appointed to check the progress of the work. 


This stage starts from the point when the client hands over the property to the contractor to the stage when the completed project is handed back over to the owner.


Post-construction stage


Last, yet absolutely, not least, the post-construction stage. Since the project has been finished, the project manager will consult the client for any modifications or make improvements to make things more efficient. 


There are as yet a couple of steps that should be gone through before the keys to the structure can be given over. The last phase of the construction project is partitioned into three basic steps: 


New development building commissioning


First of all, an examination of the entire structure should be finished. Even if everything is done effectively, these reviews are genuinely easy to pass. 


When everything has been checked, it is an ideal opportunity for the project team to prepare the customer to operate and keep up with the newly constructed structure. That is a stage of extensive significance as it will add to expanding the lifecycle of the house. 


Proprietor occupancy


Since all the house construction stages are finished, the proprietor can take over the structure. This is the point at which the warranty time frame begins. This keeps the client satisfied with the services, equipment, and materials used for constructing the house. 


There are three principle sorts of warranties in construction: 


Express warranty: It is ordinarily mentioned in the agreement. 

Inferred warranty: It is forced by law. 

Statutory warranty: It is presented by the state's guidelines. 


Conclusion 


That is to keep going forward in the long cycle of planning and finishing a house construction project. Now, it is additionally a decent practice to do a post-construction survey which could assist the various agents with recognizing any assignments that weren't finished, break down why this occurred, and set up a rundown of experiences for what's to come. 